Search Similar
  1. Home

Boats similar to 207' Delta 2024

boat-cover

50.0 ft.

|

2023

Fort Lauderdale FL

The Helm Yacht Group

boat-cover

206.99 ft.

|

2026

Seattle, WA

Denison Yacht Sales

boat-cover

27.0 ft.

|

2020

Naples, Florida

SYC Yachts

boat-cover

20.01 ft.

|

2013

Elberta, Alabama

POP Sells

boat-cover

20.01 ft.

|

2007

Scottsdale, Arizona

POP Sells

boat-cover

20.01 ft.

|

2006

Lehigh Acres, Florida

POP Sells

boat-cover

27.0 ft.

|

2005

Southern Shores, North Carolina

United Yacht Sales

boat-cover

89.01 ft.

|

1995

San Diego, California

Northrop and Johnson

View more similar boats Arrow

Boat not available.

207' Delta 2024 for sale in Seattle, Washington United States of America

LOCATION

Seattle, Washington United States of America

YEAR

2024

LENGTH

206.99 ft.

DETAILS

Condition

New

Year

2024

Make & Model

207' Delta 2024

Boat type

Power

Length

206.99 ft.

Location

Seattle, Washington United States of America

Tax status

Ex VAT

MEASUREMENTS

Beam

39.99 ft.

Cabins

7

Draft

10.99 ft.

DESCRIPTION

Project Metaverse is a collaboration between Greg C Marshall Design and Delta Marine Shipyard combining two of the best in their respected fields to build what is destined to be an iconic global explorer.Expanding on the success of the 45m Big Fish, Project Metaverse features some amazing features that set her apart from other designs: large open beach club with multiple bathing platforms, crows nest viewing deck, glass bottom pool, tender garage forward, and a private full beam owner's suite complete with balconies on both the port & starboard sides one with a spa pool.Every detail on this design has been well thought out and assures that each deck flows smoothly from bow to stern: crew can access each deck efficiently with minimal interruption to the owner & guest parties, crew can handle tender operations seamlessly.This project is waiting for a buyer to be introduced so that we can customize the final details, interior decor package, and request any modifications to the build they feel are necessary for their requirements, lifestyle, and intended usage.______________Project Metaverse is the worlds first Super Yacht NFT and is the first of its kind new construction project using custom augmented realty technology design to provide the client with the ultimate metaverse build experience.Throughout the entire build process the client will be able to meet Gregory Marshall and myself in the metaverse as we build this historic yacht.At the moment we are only accepting ETH and BTC for payment on Project Metaverse but are open to a more traditional sales process.
Project Metaverse - Overview
Project Metaverseis the worlds first Super Yacht NFT and combines the vision of legendary designer Gregory C Marshall with highly acclaimed Delta Marine Shipyard with the end result being a top pedigree new construction project destined to leave a long lasting legacy on the yachting industry.
Project Metaverse NFT is a first of its kind new construction projectusing custom augmented realty technology designed to provide the clientwith the ultimatemetaverse buildexperience. Throughout the entire build process the client will be able to meet Gregory Marshall, myself and the Delta team in the metaverse as we build this historic super yacht.
The design behindProject Metaverseclearly has ties to the award winning 45m custom expedition yacht BIG FISH which was delivered back in 2010 and has been consistentlycruising the remote regions of the worlds oceans ever since.
Project Metaversefeatures a full displacement steel hull & composite superstructure which takes advantage of the expertise offered by Delta Marine Shipyard who is a world leader in this segment of the market. 1245 GRT assures large volume on every deck. A maximum speed of 16.5m can be achieved while a 4,000nm is possible at a cruising speed of 12 knots. She sleeps 14 guests in 7 spacious en-suites and up to 18 crew.
Key design features onboard include touch-and-go helicopter operations on the bow, expansive beach club with 37m of fold down platforms, elevator servicing every deck, handicap accessible, 2 VIP cabins located on the main deck forward, 4 guest cabins on the lower level with direct access to the beach club, commercial grade galley, unique crows nest viewing level above the sundeck, massive glass bottom pool located aft on the main deck over the beach club, 87 square meter owner's apartment with private balconies and spa pool, and tender garage located forward with gull-wing doors allowing for easy access when deploying or retrievingtenders/submersible/or toys
STATEMENT FROM THE BROKER
Project Metaverseis a collaboration between Gregory C Marshall Design and Delta Marine Shipyard combining two of the best in their respected fields to build what is destined to be an iconic global explorer. Top pedigree, full custom and this design will set itself apart by incorporating build techniques that have never been implemented before thus the origin of the nameProject Metaverse.
Expanding on the success of the 45m Big Fish,Project Metaversefeatures some amazing features that set her apart from other designs: large open beach club with multiple bathing platforms, crows nest viewing deck, glass bottom pool, tender garage forward, and a private full beam owner's suite complete with balconies on both the port & starboard sides one with a spa pool.
Every detail on this design has been well thought out and assures that each deck flows smoothly from bow to stern - crew can access each deck efficiently with minimal interruption to the owner & guest parties, crew can handle tender operations seamlessly.
This project is waiting for a buyer to be introduced so that we can customize the final details, interior decor package, and work through any modifications to the build they feel are necessary for their personal requirements, lifestyle, and intended usage.
Final pricing will be determined by the final LOA, gross tonnage, fit and finish of the interior decor package requested by the owner, and options/features/modifications incorporated into the final design.
Final delivery date will depend on when technical specifications and contracts are finalized. We estimate a 32 month build period from once that is accomplished.
STATEMENT FROM GREGORY C MARSHALL DESIGN
Over the years, Gregory C. Marshall Naval Architects has designed some of the most Iconic and groundbreaking Adventure Yachts in the world. VVs1, BigFish, Artefact collected a total of more than twenty different Superyacht Awards. Each Superyacht has travelled to the most remote destinations of the world and carried their Owners and guests in uncompromised style.
The latest groundbreaking project from Greg Marshalls office is a unique collaboration between Alex Clarke at Denison Yachting, Cloud Yachts and Delta Marine in Seattle. DubbedProject Metaversethis 63 meter yacht combines some of the most advanced holographic design tools being used in the industry. This allows the client to interact with both the design office and the shipyard throughout the design & build PROCESS as never before.
STATEMENT FROM DELTA MARINE SHIPYARD
'Delta is excited about this opportunity, to explore new ideas and work with an amazing team.Combining the unique strengths of all four brands will result in an innovative, creative and dynamic project.Deltas decades of experience building custom yachts, our state of the art facility and extraordinary craftsman working in all the marine trades, will ensure the project is built to the highest quality.'- Michelle Jones
Founded in 1967, Delta is a family owned and operated yacht-building business. It is a business built on lasting relationships with customers and a mission to consistently perform at the highest level, deliver world-class yachts of the highest distinction, and do business with a solid foundation of trust and honesty.
Today, Delta has the capability to build yachts up to 100 meters that are among the finest luxury yachts in the world. Deltas drive to create innovative and beautiful yachts is achieved through the collaboration of the most dedicated craftsmen in the industry, investment in its facility, and engineering genius all while surrounded by the breathtaking backdrop of adventure and exploration found in the majestic Pacific Northwest. By incorporating the most advanced technology, coupled with years of experience in composite construction, Delta continues to earn the highest respect and consideration among industry peers, captains and crews, and most importantly owners.
Located on a sprawling 25 acres, Delta has nearly 300,000 square feet of covered manufacturing space in a state-of-the-art facility. The company prides itself on housing all the marine trades on site, and sources as many American-made products and supplies as possible. Its Deltas successful formula to produce the finest quality work. Thanks to this comprehensive and connected facility, Delta team members have a fluency about ongoing projects that is unmatched. The shipyard is one of the most advanced, and Delta continually updates equipment and invests in new processes and technology in order to provide customers the most progressive and superior manufacturing ability. Delta is also an excellent custodian of the environment and the waterway where the work is performed. It ensures manufacturing is done indoors and manages its waste stream with the utmost care. In all ways, the Delta facility represents the best of metal and composite construction for yachts up to 100 meters.
For more than 40 years, Deltas most important value has remained unchanged. Delta provides the finest custom yacht manufacturing and services with an owners vision and desires at heart. This is a lasting commitment. As new generations of professionals join the ranks and unprecedented technologies enhance their capabilities, Delta remains steadfast in its goal to produce world-class yachts that are truly beyond compare.
STATEMENT FROM CLOUD YACHTS
We set out to make the world first NFT yachts withindustry design icons like Gregory Marshall, we accomplished step 1 with an overwhelming support from the yachtingcommunity.Greg and I quickly realized the NFTs we have created haveincredible utility which sent us down a pretty deep rabbithole.From this deep dive, Project Metaverse NFT was born. With thehelp of Alex Clarke & Delta Marine we can now manage a very complex build processwith 1000s of data points inside the NFT. The meta data will bestored on the block chain and only accessible to the owner of the NFT. Its anexciting use of newtechnology and we arevery aware this is just the start.

PROPULSION

Cruising Speed

12

Max Speed Knots

16

ADDITIONAL INFORMATION

HULL

Hull Material

Steel

ABOUT 207' DELTA 2024

The 207' Delta 2024 is 210 feet long that boasts a 40 feet beam. This 2024 207' Delta 2024 is capable of reaching a maximum speed of 16 knots and a cruising speed of 12. The 207' Delta 2024 is made of steel.