| Description | Complete restoration from October 2005 to May 2010: • The boat was completely restored in an Italian shipyard. The ship was flamed and polished wood. • Also the hull has been flamed, made a completely new keel and installed, repaired and the wood and rebuilt. • A completely new deck and new board walls from 22mm plywood Mahogany made, exchanged some body parts. • The rear / mirror has been completely removed, reinforced and rebuilt • A hydraulic gangway (65cm width!) With handrail, LED lighting and a lift capacity of 450kg at 3.5 meters, was made to measure. • The entire ship was 3 x epoxy grouted, 3 x 3 x epoxy primed and painted. • A new, larger swim platform teak and its frame was custom made from stainless steel. • The electrical system has been revised and updated for the most part. • Service on both machines, and transmissions made. • New boat propellers mounted. • New fishing - Panda diesel generator. • New automatic bilge pumps. |